1 |
Naein-Kashan-Rey 24” Product Pipeline |
Ongoing |
NIOE & C |
Engineering |
Detail Design of 24” Dia. Transmission Pipeline and Pump Stations |
2 |
Abadan-Arak-Rey Crude & Product Pipeline |
Ongoing |
NIOE & C |
Engineering |
Detail Design of 24” Dia. Transmission Pipeline and 12” Nos. of Pump Stations |
3 |
Esfahan-Kerman 16” Product Pipeline |
Completed |
NIOC |
Corrosion Prevention |
Site Survey & Site Tests and Detail Design of Corrosion Prevention System |
4 |
Abgineh Flat Glass Factory |
Completed |
Private Sector |
Detail Design |
Detail Design of Second Melting Furnace and Auxiliaries |
5 |
Amak Project |
Completed |
NISOC |
Basic & Detail Design & Technical Services |
Basic & Detail Design of Gas Refinery, Compressor Stations & Power Transmission |
6 |
Ethylene Plant – Second Quench Colum |
Completed |
Abadan Petrochemical |
Detail Design |
Detail Design of the Tower and Related Piping & Tower Foundation |
7 |
Razi Petrochemical Complex |
Completed |
Razi PC |
Detail Design |
Basic & Detail Design of 43 Projects and Sub-Projects |