# | Project Title | Status | Client | Contractual Scope | Brief Scope of Work |
---|---|---|---|---|---|
1 | Naein-Kashan-Rey 24” Product Pipeline | Ongoing | NIOE & C | Engineering | Detail Design of 24” Dia. Transmission Pipeline and Pump Stations |
2 | Abadan-Arak-Rey Crude & Product Pipeline | Ongoing | NIOE & C | Engineering | Detail Design of 24” Dia. Transmission Pipeline and 12” Nos. of Pump Stations |
3 | Esfahan-Kerman 16” Product Pipeline | Completed | NIOC | Corrosion Prevention | Site Survey & Site Tests and Detail Design of Corrosion Prevention System |
4 | Abgineh Flat Glass Factory | Completed | Private Sector | Detail Design | Detail Design of Second Melting Furnace and Auxiliaries |
5 | Amak Project | Completed | NISOC | Basic & Detail Design & Technical Services | Basic & Detail Design of Gas Refinery, Compressor Stations & Power Transmission |
6 | Ethylene Plant – Second Quench Colum | Completed | Abadan Petrochemical | Detail Design | Detail Design of the Tower and Related Piping & Tower Foundation |
7 | Razi Petrochemical Complex | Completed | Razi PC | Detail Design | Basic & Detail Design of 43 Projects and Sub-Projects |